Call Us 24/7
+1 760-671-0443
send mail us
enquiries@matlockconstructions.com
329 MaryAnne Ave
Barstow, CA 92311
language
English
Call Us 24/7
+1 760-671-0443
send mail us
enquiries@matlockconstructions.com
329 MaryAnne Ave
Barstow, CA 92311
language
English
Our Projects:

Building Dreams into Reality

Our diverse portfolio represents decades of construction experience backed by a passion for quality, outstanding client service and the latest industry technologies. At Matlock Constructions, we believe that every construction project is an opportunity to turn visions into reality. Our portfolio showcases a diverse range of projects that reflect our commitment to quality, innovation, and customer satisfaction.
We pride ourselves on our ability to transform spaces into functional, beautiful environments that meet our clients’ needs. From residential homes to commercial or industrial buildings, each project tells a story of craftsmanship and dedication.

QEW & Seventh St. Interchange

Clients

Ministry of Transportation (“MOT”)

Region

Central Canada

City

St. Catharines

Budget

N/A

Year Completed

2016

Size

N/A

Sector

Civil, Infrastructure

Sub-Sector

Highways

The Story

The scope of this project was divided into two phases. Phase 1 covered the removal of the Seventh Street bridge outside of St. Catharines within a period of 12 hours and the construction of a new bridge over the QEW at the same location. In Phase 2, the new Seventh Streetbridge was raised to accommodate the required vertical clearance over the QEW and lengthened to accommodate a 10-Lane cross-section on the busy highway. The project included the reconstruction of the sidewalk on the west side of the bridge. Drainage improvements were also constructed, including collecting storm water runoff from QEW and Seventh Street roadways.

The original Seventh Street Bridge was the largest bridge in Ontario to be demolished within a single night during a full closure of the QEW. The demolition was scheduled for a 12-hour window, but Matlock was able to finish the full removal in only 10 hours. Adhering to the company’s commitment to sustainability, all removed concrete was repurposed into granular material for future contracts in the area and the former bridge’s steel was fully recycled.

The Seventh Street Interchange is the first interchange in Ontario to have roundabouts servicing the highway entrances and exits on both the north and south ramp terminals.

Phase 2 covered the construction of a new bridge. All reconstruction efforts needed to adhere to the MTO’s heritage guidelines, which dictated that the liner type in the barrier wall was to match other structures in the Niagara area, as well as have a consistent landscape design.

 

 

 
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare